Offshore References
New access tower fixation on the DanTysk OAP
From deformed rubber fenders to a rigid steel connection
Service
Access tower refit
Location
DanTysk Offshore Accommodation Platform · North Sea
Result
Work successfully accepted
Following a storm, the access tower of the DanTysk offshore accommodation platform had become twisted. mh² replaced the deformed rubber fenders with steel cones and reinforced the existing structure.
The challenge
The access tower, along with the boat landing and platform access, forms a safety-critical interface for CTV operations. Following Storm Herwart, a slight twisting of the access tower was detected; the rubber cone fenders of the horizontal fixation showed signs of deformation and surface cracking, and could no longer ensure a permanent and reliable connection.
A root cause analysis pointed to inaccuracies in the original design. The goal was therefore not only to replace the damaged parts but to implement a structurally stiffer solution that prevents further relative movement between the access tower and the platform structure.
Our solution
01 · Transforming the cause of damage into a structural solution
The existing horizontal fixation was evaluated and replaced with a rigid steel connection. Gusset plates and stiffeners distribute the forces into the existing structure.
02 · Prefabricating components with quality assurance
Steel cones, gusset plates, and stiffeners were prefabricated, quality-tested, coated, and prepared for offshore installation.
03 · Creating controlled working conditions
Scaffolding, containment, and rope access provided entry to hard-to-reach areas and protected welding and coating work from the elements.
04 · Remove fenders and install steel fixation
The deformed rubber elements were removed and the connection areas prepared. New steel cones, gusset plates, and stiffeners were fitted and welded in a defined sequence.
05 · Quality inspection and restoration of corrosion protection
The welded joints underwent non-destructive testing. This was followed by local coating work in accordance with offshore category C5-M High and the preparation of as-built documentation.
What made this project special
- Urgent implementation in spring 2020.
- Work on the central CTV access interface of an operational platform.
- Local reinforcement of an existing offshore structure using complex welding sequences.
- High corrosion protection requirements (C5-M High) and quality control by IWE/FROSIO L3.
The result
The horizontal fixation of the access tower was modified in accordance with the approved design documents; the acceptance report confirms the successful completion of the work.
Remaining tasks included local coating touch-ups in scaffolding, containment, and contact areas, as well as a subsequent coating campaign inside the boat landing.
Project details
Client
Vattenfall
Project no.
mh-0411
Period
Spring 2020
Duration
2020
Scope
1 Access Tower · Fixation and reinforcement
Role
general contractor
Service area
Conversion, Modifications & Repairs
Location
DanTysk Offshore Accommodation Platform · North Sea